Curzey Learn · Worksheet
Laboratory Utility Worksheet
A coordination worksheet for power, UPS, gases, water, drainage, extraction, data and isolation points.
Section 01
Electrical and communications
Normal, UPS and standby power loads.
Socket type, voltage, phase and dedicated circuits.
Data, monitoring, alarms and controls.
Power-quality and earthing requirements.
Section 02
Mechanical and piped services
Supply, extract and equipment exhaust.
Laboratory gases and pressure requirements.
Water quality, drainage and neutralisation.
Isolation, maintenance and future connection points.
Continue planning
Use the complete Workplace Guide or continue into Curzey's planning tools.