Curzey
Curzey design and build interior project showing coordinated design and construction delivery

Design & Build Services

One coordinated route from design intent to finished space.

Curzey's design-and-build service connects briefing, interior design, cost planning, procurement, construction, installation and handover under one coordinated delivery framework.

Responsibility

Integrated

Core stages

Design → Build → Handover

Commercial control

Scope + Cost + Programme

Primary markets

Nairobi + Coast

The route

How interior design-and-build works

Design-and-build combines the design and implementation responsibilities that are often split between separate appointments. The intention is not to skip design; it is to keep design decisions, costing, procurement and construction connected as the project develops.

Curzey establishes the brief and project controls first, develops the interior design and technical package, tests commercial implications, coordinates procurement and then manages the fit-out through completion and handover.

  • Project brief, surveys and site due diligence
  • Concept and detailed interior design
  • Cost planning, quotations and scope definition
  • Approvals, procurement and long-lead coordination
  • Construction, joinery, furniture and specialist installations
  • Quality control, testing, snagging and handover

Project fit

When design-and-build is a strong choice

The route is particularly useful when a client values a coordinated point of responsibility, needs early cost visibility, has a compressed programme or wants procurement and construction input while the design is still being developed.

It is not automatically the right route for every client. Formal institutions may require independent consultants and competitive tendering, while highly specialised projects may need additional specialist appointments. The delivery model should follow the governance and risk profile of the project rather than a sales preference.

Cost certainty

A good design-and-build process still needs transparent commercial control

Single-point delivery should not mean that scope becomes opaque. The client should be able to understand what is included, what remains provisional, which assumptions affect price and what happens when the brief changes.

Curzey connects the developing design to estimates, procurement and value-engineering decisions so that design ambition is tested against the practical project budget before work is committed on site.

Programme

Where integration can save time

Traditional procurement often waits for a complete design before contractor pricing begins. A controlled design-and-build programme can identify long-lead items, early works and procurement packages sooner, allowing some decisions to overlap without losing governance.

Fast-tracking only works when client approvals are timely, unresolved design decisions are visible and procurement is sequenced around the real critical path. Compressing dates without those controls usually transfers risk downstream rather than removing it.

Frequently asked questions

Useful answers before you start.

What is the difference between design-and-build and hiring an interior designer only?

A design-only appointment typically ends with design, documentation and agreed site-support services, while the client separately appoints the contractor. Design-and-build combines the design and implementation route under a more integrated responsibility structure.

Is design-and-build faster?

It can be faster because design, cost planning and procurement can overlap in a controlled way. The actual programme still depends on approvals, site conditions, specialist services, client decisions and long-lead materials or equipment.

Can design-and-build still be cost controlled?

Yes. Cost control should be explicit, with a defined scope, assumptions, estimates or quotations, change control and visibility of procurement decisions. Integration should improve coordination, not remove commercial transparency.

Does Curzey provide design-and-build at the Kenya Coast?

Yes, subject to project scope and location. Coastal projects require additional attention to material durability, logistics, corrosion, humidity, contractor coordination and site supervision planning.

Your next space

Ready to buildsomething exceptional?

Bring us your challenge, ambition or early idea. We'll help you move from questions to clear, confident design and delivery decisions.